Steve
Member III
A lingering question, -I never have found an Ericson rigging schematic to follow on the E35-3, only a factory inventory list of rigging materials, I've always wondered about the official main sheet rigging layout versus the apparent slight interference with the boom vang at the boom connection. My mainsheet will rub slightly on the vang as it passes by on the way to the final block before the 90 degree turn to the block at the mast collar. Does this sound like OEM or was there another way ?
I'm thinking of adding a large bail to offset the vang a little lower and allow the sheet to pass above. Also my final main turning block is on the boom rather then the gooseneck due to interference with the 2 reefing lines, is this an issue? "long term stress?"
It occurred to me that Ericson would have done this also, so I question if the way I'm currently set-up is correct, although functional. Boy, any photos posted would be great, pics do say a 1,000 words!
Thanks Steve E35-3 #159
I'm thinking of adding a large bail to offset the vang a little lower and allow the sheet to pass above. Also my final main turning block is on the boom rather then the gooseneck due to interference with the 2 reefing lines, is this an issue? "long term stress?"
It occurred to me that Ericson would have done this also, so I question if the way I'm currently set-up is correct, although functional. Boy, any photos posted would be great, pics do say a 1,000 words!
Thanks Steve E35-3 #159