Ok thanks. Read those. My chain plate is fine it is the bulkhead that is partially rotten from leaking.
My thought is to loosen the shroud, remove the chain plate. Replace a section of the bulkhead and double up on each side to secure the partial replacement.
A few locals are saying to use some penetrating epoxy and then sandwich the existing plywood.
Just thought I would ask here.
This boat is new to me. A 1971 Ericson 35 MKII with a Yanmar 3GM30F with more equipment than you can imagine. Radar, GOS,auto helm, Sailomat 700 windvane , electric windlass, 6 self tailing Harken winches in the cabin, Barisnt and Andersen on mast, and on and on.
I am working on replacing HAYLARDS: 1 Main, 2 Head Sail, 1 Staysail, 1 Topping Lift, 2 Spinnaker, 2 Foreguy.
once I do this, secure the chain plate and change the oil I can get her off the dock.
Christian I enjoy your videos and sense of humor.