This last week saw some good progress. The painting is definitely a two person job, and both have to know how to mix and apply the catalyzed paint. The stuff is really fussy about thinning, temperature, and etc. One person keeps running the 'gun' and the other mixes the paint components and...
Greeetings fellow Vikings! At last comes the build back of the side decks and with great excitement we realize that we are nearing the end of the balsa core replacement on the deck!!!! After the side decks there is only one small foredeck area left!!!
Fitting the Balsa Core
For whatever...
In early December of 2021 we hauled out our ‘72 E27 at Eddie’s Marine in Wilmington, California.
Work performed by me: Replacement of gate valves with Forespar 93 Series seacocks. Installation of seawater strainer. Re-packing of stuffing box. Re-greasing/shimming of rudder post.
Work performed...
The new dodger is on. The new clutches and larger winches are in place.
This is a newer fabric, "RECacril" that is rated better than "Sunbrella" for weave integrity and QC. Since cost is about the same, and the canvas shop has been having great luck with it, we decided to give it a try.
This...