Geoff Johnson
Fellow Ericson Owner
Unfortunately, no photo, but you are right, it is a two line system. You have to run the tack line through a small shackle at the goose neck to keep the tack next to the mast. Also, I ran out of deck organizer space, and since Schaeffer does not make a six pulley organizer (at least in stainless) I stacked a two pulley organizer on top of the a three pulley organizer. The tack reefing line is on the starboard side and the clew line on the port side so that the genoa halyard winch can be used to tension that line. Finally, I run a sail tie through the clew cringle around the boom to take some of the load off the reefing tracks on the boom and to get the clew closer to the boom. Alternatively, you could run the reefing line under the boom.