I purchased an E29 this summer with partial spinnaker rigging and want to determine what additional hardware I'll need.
I have the spinnaker pole, the mast has a spinnaker ring on the front, there is one 2.5" block mounted on the lower starboard side of the pulpit and 1 car on the starboard track where I could mount another block. One of the halyard winches has been relocated to the top of the cabin by the cockpit, the other remains on the mast.
I'm assuming I can run another halyard and topping lift but will know in a couple of weeks when I pull the mast.
Anyone with an E29 have an idea what else I'll need?
thanks
dave
I have the spinnaker pole, the mast has a spinnaker ring on the front, there is one 2.5" block mounted on the lower starboard side of the pulpit and 1 car on the starboard track where I could mount another block. One of the halyard winches has been relocated to the top of the cabin by the cockpit, the other remains on the mast.
I'm assuming I can run another halyard and topping lift but will know in a couple of weeks when I pull the mast.
Anyone with an E29 have an idea what else I'll need?
thanks
dave