I've begun to think that a good part of "seamanship" might is based on being able to pick the least-bad option out of a spectrum of sucky choices...
I spent a lot of time on Makana in June un-doing the effects of a very wet winter. Partly because it needed doing and was normal - albeit late in...
Before...
...After
It's amazing what a little fresh paint and new gauges will do for an engine instrument panel.
And, a box of new marine grade wire, some fancy LED-backlit buttons, a grip of heat-shrink ring terminals, a heat gun burn on my upper arm, 1/8" weatherproof rubber matting...
The image below summarizes the main projects completed on our 1981 E28+ during our first year-and-a-half of boat ownership (any boat ownership, not just this one). The various posts on this site were instrumental in providing guidance and encouragement to more boldly go where it might not have...
The new dodger is on. The new clutches and larger winches are in place.
This is a newer fabric, "RECacril" that is rated better than "Sunbrella" for weave integrity and QC. Since cost is about the same, and the canvas shop has been having great luck with it, we decided to give it a try.
This...