I am relocating the bow lights to the pulpit and am wondering about how to seal the holes I will have to drill (or, figure out a way to make sure it all drains out somehow). The wires will enter at the top and exit on the aft stanchion base on the port side. If any water gets in it will travel down the wires, and into the boat (ok) but some will inevitably travel down the other side and get trapped. I have a few thoughts but figured I would solicit some opinions from people who have done this. Or haven't but might have some good ideas.
Here are some shots of the setup.
Thanks!
Doug
Here are some shots of the setup.
Thanks!
Doug